Oxworks – Frameless Glass Pool Fencing DIY Video – Core Drill Spigots

Oxworks – Frameless Glass Pool Fencing DIY Video – Core Drill Spigots



using the supplied frameless glass mud map with reference to the provided example draw a detailed dimension plan or might map to highlight the line of your frameless glass pool fencing runs this does not have to be scale consulting our frameless glass pool fencing product list you can work out which components you require typically you'll need panels spigots gates and get kids and a hinge panel for the gate to swing off alternatively you can contact any one of our stores and we can discuss what's required for your specific project before you start work you'll need the right tools for the job cordless drill with 5/16 drill bit chalk line pencil tape measure timber blocks approximately 50 mils deep a spirit level core drill with a 76 to 85 millimeter Corbett alan keyes bucket and jug for pouring grout electrical or masking tape a hammer chisel sponge rubber mallet timber braces and g clamps MP 16 on shrink grout 15 kilo bucket or 20 kilo bag mark the centerline of your fence with a temporary chalk line consulting your site plan mark the edge of each glass panel ensuring the gaps between each panel to not exceed 90 mil mark in any gates allowing for hinge and latch gaps mark spigot placement along the chalk line for each panel excluding the gate area you to ensure accuracy when coring your holes we recommend making a coring template from a piece of plywood score the holes to a depth of three to five millimeters without water finish drilling your holes to a minimum depth of a hundred mil clean the area thoroughly after drilling each hole slide both spigots into position double-check measurements and tighten the grub screws until they grab followed by a further half turn slide the cover plate or address ring over the spigot and tape it into position starting at the highest point of the run place timber chocks approximately 50 mil high under each panel and place the glass into position to ensure the panels stay in position brace them into place using timber bracings clamps and a heavy weight to keep them in place ensure your panel is level plumb and in line with marked fence line simply clamp the top edge of panel with timber clamps and continue along the run before you grout double check levels across both panels once you've insured these panels a level and plumb pour the mix grout into each hole using your plastic bucket or jug and drop the dress rings and clean the spigot of any excess grout once the grout is set repeat Ochs works off a glass to glass and glass the war gates these have slightly different spacing allowances mount hinges to the gate as per directions set the gate in place on top of 50 millimeter higher chocks and aligned with the top of the panel's either side attach the hinges to the hinge panel remove the timber chocks and confirm that the gate swings freely attach the mail section of the latch to the gate place the female section in position on the latch panel and tighten the grub screws onto the pressure plate tightening the top grub screw will push the top of the panel's away from you tightening the bottom grub screw will draw the top of the panels towards you loosening both screws will allow you to slide the panel back and forth placing a small Packer in the seat of the spigot will raise the glass panel to keep your fence looking in top shape regularly clean off built up debris and dirt nano-coat clear can assist in keeping your glass panels clean and free from residues metal protect can keep your spigot looking brand new you

Leave a Reply

Your email address will not be published. Required fields are marked *